from 09.03.2026 – 15.06.2026 Sewer renovation in Bernbach – lines 113, 117, BH1

Info Info

Full closure in Bernbach due to sewer renovation

Due to the sewer renovation in Bernbach, routes 113, 117 and BH1 will run differently. Please note the construction site timetables.

Bernbach “Rathaus” cannot be approached, please use the alternative stop in Südhangstrasse at Hellenwegle-Treppe.

In connection with the adjusted timetable for line 113, from March 9, line 117 will run from Bad Herrenalb “Falkensteinschule” at 12:24 p.m. until the end of the construction work seven minutes earlier at 12:17 p.m. in the direction of the outdoor pool.

This post is also available in: German